Except as otherwise provided by these regulations, public utilities (water, sewer,
electric, gas, telephone, cable, transmission lines, etc.) shall be placed in road
rights-of-way or in separate easements adjacent to the rights-of-way in accordance
with county-adopted policies for placement and minimum cover.
(b)
Where existing or proposed public utilities conflict with a proposed subdivision design,
it shall be the developer's or owner's responsibility to provide for the installation,
relocation, or removal of such utility or otherwise resolve the conflict.